Net Metering

# State CAP Technical Tariff Incentive on Excess Generation Financial Assistance Discom
1
Delhi
100% of Sanction Load - Minimum 1kWp | Maximum 1MW
Installation capacity shall not exceed 15% of Local Distribution transformer capacity
Retail Tariff
"At the end of the each Financial Year as per the rates notified by the Commission from time to time"
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
BSES / NDMC/ Tata Power
2
Haryana
100% of Sanction Load - Minimum 1kWp | Maximum 1MW
Cumulative capacity of all solar systems installed in your area shall not exceed 30% (LT connection) & 15% (HT connection) of Local Distribution transformer capacity in your area
Retail Tariff
"At the end of the each Financial Year as per the rates notified by the Commission from time to time. An incentive Rs. 0.25 paise per unit shall also be provided."
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
DHBVN/UHBVN/HVPNL
5
Uttar Pradesh
100% of Sanction Load - Minimum 1kWp | Maximum 2MW
Cumulative capacity of all solar systems installed in your area shall not exceed 25% of Local Distribution transformer capacity in your area
Retail Tariff
"At the end of the each Financial Year as per the rates notified by the Commission from time to time"
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
UPPCL/LESA
3
Punjab
80% of Sanction Load - Minimum 1kWp | Maximum 1MW
Cumulative capacity of all solar systems installed in your area shall not exceed 30% of Local Distribution transformer capacity in your 
Retail Tariff
"At the end of the each Financial Year as per the rates notified by the Commission from time to time"
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
PSPCL
4
Rajasthan
80% of Sanction Load - Minimum 1kWp | Maximum 1MW
Cumulative capacity of all solar systems installed in your area shall not exceed 30% of Local Distribution transformer capacity in your 
Retail Tariff
Any unadjusted electricity credits shall be paid as per the rates notified by RERC from time to time.
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
JVVNL/AVVNL
6
Uttarakhand
"80% of Sanction Load - With battery backup : 300 Wp to 100 kWp Without battery backup : up to 500 KWp"
Cumulative capacity of all solar systems installed in your area shall not exceed 30% of Local Distribution transformer capacity in your 
Retail Tariff
"At the end of the each Financial Year as per the lowest slab rates"
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
UPCL
7
Assam
80% of Sanction Load - Minimum 1kWp | Maximum 1MW
Cumulative capacity of all solar systems installed in your area shall not exceed 20% of distribution transformer capacity in your area.
APPC
Any unadjusted electricity credits shall be paid at APPC cost of electricity as approved by the Commission
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
APDCL
8
Madhya Pradesh
100% of Sanction Load - Maximum 1MW
Cumulative capacity of all solar systems installed in your area shall not exceed 20% of distribution transformer capacity in your area.
Retail Tariff
Any unadjusted electricity credits shall be paid as per the rates notified by MPERC
"40% Accelerated Depreciation 10 year Tax holiday on solar projects"
MKVVCL
Close Menu